THE ICDP LAKE BOSUMTWI DRILLING PROJECT: A FIRST REPORT

The ICDP Lake Bosumtwi Drilling Project: A First Report

The ICDP Lake Bosumtwi Drilling Project: A First Report

Blog Article

Summary The 10.5 -km-diameter, 1.07-Ma Bosumtwi impactcrater was the subject of a multi-disciplinary and internationaldrilling effort of the International ContinentalScientific Drilling Program (ICDP) from July to October2004.

Sixteen different holes Tracksuit Bottoms were drilled at six locationswithin the lake, to a maximum depth of 540 m.A total ofabout 2.2 km of core material was obtained.

Despite sometechnical FOIE GRAS and logistical challenges, the project has beenvery successful and it is anticipated that the first scientificresults will be available in late 2005.

Report this page